The conductor has closed up behind them after clearing the CSX at 128.9. |
Date:
10/16/2016 |
Location:
Akron, OH Map ![Show Akron on a rail map](/images/map_us.gif) |
Views:
64 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Fred Stuckmann |
|
Author: Fred Stuckmann
|
![After getting a track warrant, the engineer lines the switch onto the main.](http://s3.amazonaws.com/rrpa_photos/119070/DSC_5831p.jpg) |
Picture Categories: Action |
This picture is part of album: Finishing up their day. |