The new 2nd track is getting a few final touches. Apparently 'new temporary' Tanglewood signal for the new track using an old B&O signal is in place awaiting activation. The new Tanglewood signals are across the bridge along with a set of cross overs. /DL |
Date:
10/24/2014 |
Location:
Bladensburg, MD Map ![Show Bladensburg on a rail map](/images/map_us.gif) |
Views:
94 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Track Broom at Work](http://s3.amazonaws.com/rrpa_photos/101517/2014%2010%2024%200954%20CSX%20TrackBroom%20at%20Tanglewood%20Signal%20010%20(2).JPG) |
Picture Categories: Signal,Track |
This picture is part of album: Double Track on the Alexandria Extension |