The crew have added the 6 mtys to the consist and now prepare to shove the 6 loaded cars into the siding. |
Date:
3/30/2008 |
Location:
Lakewood, NJ Map  |
Views:
248 |
Collection Of:

Walter Anderson |
|
Author: Walter Anderson
|
 |
Picture Categories: |
This picture is part of album: NJ Southern Secondary |